Quick answer
Skid Steer Services in Fallbrook, CA costs $150 per hour with a 4-hour minimum ($600), operator and fuel included, with no travel charge anywhere in 92028 or 92088. Typical jobs: spread two truckloads of gravel or road base on a driveway, about 4 hours ($600); backfill a foundation or utility trench after inspection, about 4 hours ($600).
At a glance
- Rate
- $150 per hour, machine and operator
- Minimum
- 4-hour minimum ($600)
- Travel
- No travel charge
- Zip codes
- 92028, 92088
What skid steer services looks like in Fallbrook
Skid steer work in Fallbrook usually involves the T300 on a sloped decomposed granite lot: spreading base rock on a long private driveway, rough-grading a shed or ADU pad cut into an old grove slope, backfilling a trench to a barn, or cleaning up after a build off Reche Road or Olive Hill Road. The tracks matter here because almost nothing in 92028 is flat, and a wheeled loader spins on DG that is dust in August and soup after a February storm. The machine is parked a few minutes from Mission Road, so most Fallbrook jobs are booked within the week, and the local yards deliver base rock on short notice.
A typical skid steer services job in Fallbrook
Cleanup and two loads of debris after an ADU build off Stage Coach Lane: about $1,250 to $1,650
A typical example: a new ADU has just been finished behind a house off Stage Coach Lane, and the yard around it is littered with form boards, broken block, stucco scrap and spoil piles on compacted decomposed granite. The T300 scrapes the debris into piles, loads two 10-yard dump trailers and rough-levels the ground so the landscaper can start. Call it 5 hours: 5 x $150 = $750. Haul-off runs about $250 to $450 per load, so $500 to $900 for two. Total about $1,250 to $1,650. There is no travel charge in Fallbrook.
A worked example on normal ground. Your hours depend on the ground, the access and the material.
Typical hours and cost in Fallbrook
Everything is $150 per hour with a 4-hour minimum, with no travel charge. These are the common versions of the job on normal ground.
| Typical job | Hours | At $150 per hour |
|---|---|---|
| Spread two truckloads of gravel or road base on a driveway | 4 | $600 |
| Backfill a foundation or utility trench after inspection | 4 | $600 |
| Rough-grade a 2,000 sq ft pad for a shed, barn or ADU | 4 to 8 | $600 to $1,200 |
| Clean up a construction site and load debris | 4 to 6 | $600 to $900 |
| Move and place 40 to 60 tons of DG or fill dirt | 6 to 10 | $900 to $1,500 |
| Clear a quarter acre of light brush with the brush cutter | 4 to 6 | $600 to $900 |
Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.
What is included
- ✓Bobcat T300 compact track loader delivered to your property on our trailer
- ✓An experienced operator for every billed hour, fuel included
- ✓General-purpose bucket for dirt, gravel, DG and debris; tooth bucket for hard ground
- ✓Brush cutter, auger, breaker and pallet-fork attachments when the job calls for them
- ✓Spreading and rough leveling of material you have delivered, or material we arrange
- ✓Site walk before we start and a clean, raked finish before we load up
The ground in Fallbrook
Fallbrook soil is decomposed granite, DG, over fractured granite bedrock, with pockets of clay in the valley bottoms and boulders anywhere north of town. DG grades beautifully when damp, packs hard enough to hold a vertical cut, and turns to dust in August and to soup in a February storm. It drains well until it is compacted, which most yards are, so drainage problems are common and grading usually fixes them.
Permits in Fallbrook
Fallbrook is unincorporated, so permits come from County of San Diego Planning and Development Services, not a city hall. Most of what we do needs none: yard and shed pads, driveway regrading, drainage on your own lot, trenching, patio and shed removal. A grading permit generally applies above 200 cubic yards of cut and fill, or with deep cuts, or near a watercourse, and a demolition permit applies to permitted structures with utilities. We tell you when a job looks like it crosses one of those lines.