Quick answer
Skid Steer Services in San Marcos, CA costs $150 per hour with a 4-hour minimum ($600), operator and fuel included, plus a flat travel charge quoted before you book. Typical jobs: spread two truckloads of gravel or road base on a driveway, about 4 hours ($600); backfill a foundation or utility trench after inspection, about 4 hours ($600).
At a glance
- Rate
- $150 per hour, machine and operator
- Minimum
- 4-hour minimum ($600)
- Travel
- Flat charge, quoted before you book
- Zip codes
- 92069, 92078
What skid steer services looks like in San Marcos
Skid steer work in San Marcos usually means the Bobcat T300 leveling a sloped backyard, spreading base or DG, or backfilling behind a retaining wall on a hillside lot. In San Elijo Hills and the newer tracts the job turns on access: the T300 needs a gate of about 7 feet, many side yards are narrower, and the HOA may want the plan and a certificate of insurance before we unload. On the north side, around Twin Oaks Valley and below the San Marcos Mountains, the lots are bigger and the ground is red Las Posas clay, which the tracks handle well once it has drained for a few dry days after a storm.
A typical skid steer services job in San Marcos
50 tons of DG for a horse paddock in north Twin Oaks Valley: about $2,150 to $3,450 plus travel
A typical example: a horse property in north Twin Oaks Valley has a paddock of about 2,700 sq ft that turns to red clay mud every winter. Trucks drop 50 tons of decomposed granite at the gate, and the T300 carries it in, spreads it about 4 inches deep and track-rolls it, keeping a slight fall so rain runs off instead of pooling at the water trough. That is 6 to 8 hours, $900 to $1,200, plus 50 tons of DG at $25 to $45 a ton delivered, $1,250 to $2,250, so about $2,150 to $3,450 plus the flat travel charge.
A worked example on normal ground. Your hours depend on the ground, the access and the material.
Typical hours and cost in San Marcos
Everything is $150 per hour with a 4-hour minimum, plus the flat travel charge. These are the common versions of the job on normal ground.
| Typical job | Hours | At $150 per hour |
|---|---|---|
| Spread two truckloads of gravel or road base on a driveway | 4 | $600 |
| Backfill a foundation or utility trench after inspection | 4 | $600 |
| Rough-grade a 2,000 sq ft pad for a shed, barn or ADU | 4 to 8 | $600 to $1,200 |
| Clean up a construction site and load debris | 4 to 6 | $600 to $900 |
| Move and place 40 to 60 tons of DG or fill dirt | 6 to 10 | $900 to $1,500 |
| Clear a quarter acre of light brush with the brush cutter | 4 to 6 | $600 to $900 |
Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.
What is included
- ✓Bobcat T300 compact track loader delivered to your property on our trailer
- ✓An experienced operator for every billed hour, fuel included
- ✓General-purpose bucket for dirt, gravel, DG and debris; tooth bucket for hard ground
- ✓Brush cutter, auger, breaker and pallet-fork attachments when the job calls for them
- ✓Spreading and rough leveling of material you have delivered, or material we arrange
- ✓Site walk before we start and a clean, raked finish before we load up
The ground in San Marcos
San Marcos sits on more than one kind of rock, and the ground changes across town. The San Marcos Mountains north of Palomar College are San Marcos Gabbro, a dark rock that weathers into reddish Las Posas clay: slick and heavy when wet, hard as brick in August, and slow to drain. East of North Twin Oaks Valley, the Merriam Mountains are piles of exfoliating granodiorite boulders, and the hills toward Escondido are decomposed granite. The south side, Double Peak and San Elijo Hills, is steep and rocky, and most yards there sit on pads that were mass graded and compacted when the community was built.
Permits in San Marcos
Inside city limits, grading permits come from the City of San Marcos through Land Development Engineering. The city's engineering permits page lists earthwork, and also clearing and grubbing, as activities that need a grading permit unless exempt. Its listed exemptions include cuts and fills under 4 feet deep, under 200 cubic yards including remedial work, no fill on an existing slope steeper than 5:1, no new slope steeper than 2:1, under 5,000 sq ft of new impervious surface, no work in a floodway or floodplain, and excavations for utilities. Most yard leveling, trenching and drainage stays inside those lines; a hillside pad or a big fill may not. Removing a permitted structure goes through the city's building permits. Lake San Marcos, north Twin Oaks Valley and Elfin Forest are unincorporated, so County PDS applies there, generally above 200 cubic yards or 8 feet of cut or fill. San Elijo Hills and many tracts need HOA approval first.
