Skid Steer Services in Bonsall, CA costs $150 per hour with a 4-hour minimum ($600), operator and fuel included, with no travel charge anywhere in 92003. Typical jobs: spread two truckloads of gravel or road base on a driveway, about 4 hours ($600); backfill a foundation or utility trench after inspection, about 4 hours ($600).
At a glance
- Rate
- $150 per hour, machine and operator
- Minimum
- 4-hour minimum ($600)
- Travel
- No travel charge
- Zip codes
- 92003
What skid steer services looks like in Bonsall
Skid steer work in Bonsall usually involves horse property: leveling arena and round pen pads, crowning them to shed water, spreading and track-rolling base rock for the footing contractor, moving manure piles and opening paddock fence lines. On the estates along Gird Road, Camino del Rey and West Lilac Road the T300 also rough-grades ADU and guest house pads and spreads base on long private approaches. The valley floor along the San Luis Rey is sandy loam and the hillsides are decomposed granite, so one property can have both, and the tracks handle each. We plan the work around where the horses are that day.
A typical skid steer services job in Bonsall
Decomposed granite for a 3,000 sq ft paddock off Gird Road: about $2,200 to $3,720
A typical example: a 3,000 sq ft paddock on a horse property off Gird Road turns to mud every winter, and the owner wants a firm 4-inch layer of decomposed granite. That is about 37 cubic yards, roughly 52 to 56 tons. The trucks drop it at the gate, and the T300 carries, spreads and track-rolls it with a slight fall so water runs off. Call it 6 to 8 hours: 6 x $150 = $900 to 8 x $150 = $1,200. DG at $25 to $45 a ton is about $1,300 to $2,520. Total about $2,200 to $3,720. There is no travel charge in Bonsall.
A worked example on normal ground. Your hours depend on the ground, the access and the material.
Typical hours and cost in Bonsall
Everything is $150 per hour with a 4-hour minimum, with no travel charge. These are the common versions of the job on normal ground.
| Typical job | Hours | At $150 per hour |
|---|---|---|
| Spread two truckloads of gravel or road base on a driveway | 4 | $600 |
| Backfill a foundation or utility trench after inspection | 4 | $600 |
| Rough-grade a 2,000 sq ft pad for a shed, barn or ADU | 4 to 8 | $600 to $1,200 |
| Clean up a construction site and load debris | 4 to 6 | $600 to $900 |
| Move and place 40 to 60 tons of DG or fill dirt | 6 to 10 | $900 to $1,500 |
| Clear a quarter acre of light brush with the brush cutter | 4 to 6 | $600 to $900 |
Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.
What is included
- ✓Bobcat T300 compact track loader delivered to your property on our trailer
- ✓An experienced operator for every billed hour, fuel included
- ✓General-purpose bucket for dirt, gravel, DG and debris; tooth bucket for hard ground
- ✓Brush cutter, auger, breaker and pallet-fork attachments when the job calls for them
- ✓Spreading and rough leveling of material you have delivered, or material we arrange
- ✓Site walk before we start and a clean, raked finish before we load up
The ground in Bonsall
The valley floor along the San Luis Rey is sandy loam over river cobble, which digs easily, drains fast and makes a good base for an arena. The hills on either side are the same decomposed granite as Fallbrook, with granite boulders near the surface on the ridges toward Vista and Fallbrook. The two soils meet on many properties, and a trench that starts in sand can finish in rock.
Permits in Bonsall
Bonsall is unincorporated San Diego County, so any permit comes from County Planning and Development Services. Pads, driveways, trenching, drainage on your own lot and small demolition need none. Larger grading, work in the river floodplain or near a mapped creek, and anything inside the Bonsall Community Plan's resource conservation areas can need County review. Arenas and barns over a certain size need building permits that your builder pulls; the pad itself usually does not.