How Much Does It Cost to Hire a Bobcat With an Operator? (2026 North County Rates)

The hourly rate, the minimum, what is included, what is not, and how many hours the common jobs really take, with worked examples.

$150 per hour • 4-hour minimum • Operator and fuel included • Insured

SoCal Dirt Movers, Fallbrook, CA • Updated

Quick answer

Hiring a Bobcat with an operator in Fallbrook and North San Diego County costs $150 per hour with a 4-hour minimum, so the smallest job is $600. Operator, fuel and delivery in the core area are included. Most homeowner jobs take 4 to 8 hours ($600 to $1,200 in labor), plus any material, haul-off or travel, which are quoted before the work starts.

At a glance

Hourly rate
$150 per hour, machine and operator
Minimum
4 hours ($600)
Typical homeowner job
4 to 8 hours, $600 to $1,200
Included
Operator, fuel, attachments, delivery in the core area
Extra
Material, haul-off and dump fees, travel outside the core area
Machine
Bobcat T300 compact track loader, mini excavator on request

What does $150 an hour include?

The $150 hourly rate covers the machine, the person running it and the fuel it burns. There is no separate equipment charge, no operator surcharge and no fuel line on the invoice. The same rate applies to the Bobcat T300 compact track loader and to the mini excavator, and to both when a job needs the two machines on the same trip.

Delivery is included anywhere in the core area: Fallbrook, Bonsall, Rainbow, De Luz, Pala and Valley Center. Temecula, Murrieta, Vista, Oceanside, San Marcos, Escondido and the Camp Pendleton area get a flat travel charge that you hear before you book, never after.

  • The Bobcat T300, the mini excavator, or both, delivered on our trailer
  • An operator with five years on the machines and a family background of more than 25 years in dirt work
  • Fuel for every billed hour
  • The attachment the job needs: general-purpose or tooth bucket, brush cutter, auger, hydraulic breaker or pallet forks
  • A walk of the work area with you before the machine unloads
  • A raked, clean finish before the machine reloads

Billing after the minimum is in half hours. If a job quoted at six hours is finished in five and a half, you pay for five and a half. See the full pricing page for typical hours on every service.

Why is there a 4-hour minimum?

Loading the machine, towing it, unloading it and doing the same in reverse takes close to two hours whether the job lasts thirty minutes or all day. A 4-hour minimum covers that time without raising the hourly rate for everybody. It is the reason the rate can stay at $150 for long jobs too.

In practice the minimum rarely stretches anyone. Most of the jobs people call about fit inside four hours: regrading a dirt driveway, cutting a 100-foot trench, leveling a shed pad, breaking out a patio, spreading a truckload of base rock. When a job is smaller than that, the smart move is to bundle it with the next thing on the list, because a shed pad and a drainage swale done the same morning cost one minimum, not two.

How many hours will my job take?

Hours depend on the job, the ground and the access. The table below shows typical ranges on normal ground with a gate the machine fits through. Rock, roots, steep slopes, wet clay and tight access push a job toward the top of its range or past it, and we tell you which of those we see before we start.

Typical hours and labor cost for common Bobcat and mini excavator jobs in North County (2026)
JobTypical hoursLabor at $150/hour
Regrade and crown a 300-foot dirt driveway4$600
Level a 12 x 20 ft shed or carport pad4$600
Trench 100 feet for a water or irrigation line4$600
Break up and load a 400 sq ft patio4$600
Spread 20 tons of base rock or DG4$600
Cut 100 feet of defensible space around a home4 to 8$600 to $1,200
Level a 2,000 sq ft backyard4 to 6$600 to $900
Grade a 1,000 to 1,200 sq ft ADU pad on a flat lot6 to 8$900 to $1,200
Cut and fill a pad into a hillside lot8 to 16$1,200 to $2,400
Clear an acre of heavy chaparral and small trees8 to 16$1,200 to $2,400
Labor only. Material, haul-off, dump fees and travel outside the core area are quoted separately.

What costs extra?

Anything that is not machine time is quoted separately, at cost, and approved by you before the job. There are four things that come up:

  • Material. Road base, decomposed granite, gravel, fill dirt, drain rock, pipe and fabric. Clean fill in North County generally runs $15 to $35 a yard delivered and road base $25 to $45 a ton, depending on the yard and the distance. You can order it yourself or we order it.
  • Haul-off. The machines move material around the property but do not haul it away. Debris, concrete or spoil that has to leave goes in a dump trailer or a roll-off. A 10-yard load of broken concrete typically runs $250 to $450 including the recycler fee.
  • Travel outside the core area. A flat charge based on the address, quoted before you book.
  • Specialty extras. A chipper on a big land-clearing job, or a vibratory roller and compaction testing when an engineered plan calls for them.

What do real jobs cost, start to finish?

Three typical examples, worked out the way the quote is written. Your numbers will differ with the ground, the access and the material prices on the day, but the arithmetic is the same.

  1. 1

    Driveway regrade with new road base: about $1,850 to $2,800

    A 300-foot dirt driveway, 10 feet wide, regraded and crowned, then topped with 3 inches of Class II road base. The base works out to about 28 cubic yards, roughly 38 to 42 tons. Six hours of machine time is $900. The base at $25 to $45 a ton delivered is about $950 to $1,900. Total: roughly $1,850 to $2,800, landing toward the low end when the material yard is close.

  2. 2

    Backyard leveling in a Temecula tract: about $600 to $900 plus travel

    A 2,000 sq ft builder-grade yard, high spots cut and low spots filled with the material already on site, graded to fall away from the house for pavers or turf. Four to six hours is $600 to $900, plus the flat Temecula travel charge. No material if the yard balances, which most do.

  3. 3

    Patio removal ahead of pavers: about $850 to $1,050

    A 400 sq ft, 4-inch concrete patio broken with the hydraulic breaker and loaded. Four hours is $600. The slab is about 5 cubic yards of concrete, one 10-yard load at $250 to $450 to the recycler. Total: about $850 to $1,050. The concrete removal guide has the other slab sizes.

Is it cheaper to rent a Bobcat and do it yourself?

Only on paper, and only for some jobs. A skid steer rents for roughly $250 to $400 a day plus delivery and pickup, and you supply the fuel, the operator and the risk. A first-time operator usually spends the first couple of hours learning the controls, and the finish grade shows it. Damage to the rental, to the driveway or to a buried line is yours.

With an operator, a job that takes four hours costs $600 and is done by lunch. Renting starts to make sense for experienced operators with several days of simple work. For a one-day homeowner job, hiring usually costs about the same and comes out better. We break the numbers down in renting a skid steer vs hiring an operator.

How do I keep the hours down?

Most of the difference between a four-hour job and a six-hour job is preparation. Six things save real money:

  • Measure the gate. The T300 needs an opening of about 7 feet. If yours is narrower, say so and we plan around it before the trailer leaves.
  • Call 811 two working days before any digging. A trench that waits on a locate is a wasted trip. Read how DigAlert works.
  • Have material dropped the day before. A machine spreading is cheaper than a machine waiting for a truck.
  • Mark the plan with paint or stakes: pad corners, the trench line, the edge of the clearing.
  • Clear the route from the street to the work area: cars, hoses, pots and the trampoline.
  • Bundle the small jobs. Everything on the list in one visit costs one minimum.

How do I get an accurate quote?

Text three or four photos of the area with something in the frame for scale, like a truck, a fence or a person, and describe what the ground should look like when we leave. For most jobs that is enough to give you a range of hours the same day. For bigger grading, clearing and road jobs we walk the property first at no charge and give you one number.

The person who quotes the hours is the person who runs the machine. That is the main reason the hours quoted in the morning tend to match the hours billed in the afternoon.

Questions people ask

How much does a Bobcat with an operator cost per hour in Fallbrook?

$150 per hour with a 4-hour minimum, so $600 is the smallest job. That includes the operator, fuel and delivery anywhere in Fallbrook, Bonsall, Rainbow, De Luz, Pala and Valley Center. After the first four hours you pay in half hours for the time used. Material, haul-off and travel outside the core area are quoted separately before the job.

How much does a Bobcat cost for a full day?

An eight-hour day is $1,200 in labor at $150 per hour, with the operator and fuel included. Most single-day jobs are pad grading on a slope, clearing an acre of brush, a long trench run or a driveway with several loads of base. Add material and haul-off if the job needs them; both are quoted before the machine arrives.

Do you charge for travel time?

Not inside the core area of Fallbrook, Bonsall, Rainbow, De Luz, Pala and Valley Center. Temecula, Murrieta, Vista, Oceanside, San Marcos, Escondido and the Camp Pendleton area have a flat travel charge based on the address, quoted before you book. The hourly clock runs only while the machine is working on your property.

Is the mini excavator the same price as the Bobcat?

Yes. Both machines are $150 per hour with the same 4-hour minimum, and when a job needs both, for example trenching with the excavator and backfilling with the loader, they come on the same trailer trip. You do not have to decide which machine you need; describe the job and the right one shows up.

Do I pay for hours if the job finishes early?

No. After the 4-hour minimum, billing is by the half hour actually worked. If a job quoted at six to eight hours is finished in six, you pay for six. If something unexpected adds time, like solid rock in a trench, we tell you when we hit it, before the hours are spent.

What forms of payment do you take?

Cash, check, Zelle and Venmo on the day the work is done. Jobs that run several days are invoiced at the end of each day. There is no deposit on jobs shorter than a day, and material ordered for you is billed at the cost on the yard's ticket.

How these numbers are worked out. Labor is our published rate, $150 per hour with a 4-hour minimum, times the hours these jobs typically take on normal ground. Material prices are typical delivered prices from North County yards and change with the yard and the distance. For a number on your job, text photos to (442) 271-2748 or send the estimate form.

Get a free estimate for skid steer work

Tell us the job and where it is. We reply with a range of hours the same day, and the first four hours are the only commitment.

  • $150 per hour, 4-hour minimum ($600)
  • Operator, fuel and delivery included in the core area
  • Insured. Owner-operated. Monday to Saturday, 7:00 AM to 6:00 PM