Bobcat T300 on the trailer

Pricing

$150 per hour. 4-hour minimum. Operator and fuel included.

One rate for both machines. The first four hours ($600) are the only commitment; after that you pay for the hours used. Material, haul-off and travel outside the core area are quoted before you book.

$150 per hour • 4-hour minimum • Operator and fuel included • Insured

The rate

$150/hour

4-hour minimum, so the smallest job is $600. Half hours after the minimum.

Included in the hour

  • ✓The Bobcat T300, the mini excavator, or both, delivered on our trailer
  • ✓An experienced operator for every billed hour
  • ✓Fuel
  • ✓Buckets, brush cutter, auger, breaker and forks as the job needs
  • ✓Delivery and pickup inside the core area: Fallbrook, Bonsall, Rainbow, De Luz, Pala, Valley Center
  • ✓A site walk before the machine unloads, and a raked finish before it reloads

Quoted separately, always before we start

  • Material: road base, DG, gravel, fill dirt, drain rock, pipe. Ordered at cost from local yards, or you order it.
  • Haul-off: dump trailer or roll-off for debris, concrete or spoil, plus the dump or recycler fee. Quoted before the job.
  • Travel outside the core area: a flat charge based on the address, told to you before you book.
  • Chipping on larger land-clearing jobs, arranged through a local chipper service.
  • Vibratory compaction or compaction testing when a building plan requires it.

Compared with a bare rental

A skid steer rental runs about $250 to $400 a day plus delivery, with you in the seat. A day of our operator on a job that takes four hours is $600 and it is finished by lunch, graded the way you wanted, with no damage to a rental machine or your property to pay for afterward. On jobs that take a full day the rental looks cheaper on paper and rarely is in practice.

Typical hours by job

Every number below is a typical range for normal ground and access, billed at the same rate. Rock, roots, slopes and tight gates add hours; we tell you which before we start.

Skid Steer Services

Typical hours for Skid Steer (Bobcat) Services
Typical jobHoursAt $150 per hour
Spread two truckloads of gravel or road base on a driveway4$600
Backfill a foundation or utility trench after inspection4$600
Rough-grade a 2,000 sq ft pad for a shed, barn or ADU4 to 8$600 to $1,200
Clean up a construction site and load debris4 to 6$600 to $900
Move and place 40 to 60 tons of DG or fill dirt6 to 10$900 to $1,500
Clear a quarter acre of light brush with the brush cutter4 to 6$600 to $900

Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.

Mini Excavator Services

Typical hours for Mini Excavator Services
Typical jobHoursAt $150 per hour
Trench 100 feet for a water or irrigation line, 18 to 24 inches deep4$600
Trench 200 feet of electrical conduit to a shop, well or gate4 to 6$600 to $900
Dig footings for a 60-foot retaining wall4 to 6$600 to $900
Dig footings for a 400 sq ft addition or ADU6 to 10$900 to $1,500
Pull 6 to 10 stumps from a dead grove or hedge line4 to 8$600 to $1,200
Cut a 150-foot drainage swale or French drain on a slope4 to 6$600 to $900

Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.

Grading & Leveling

Typical hours for Grading & Lot Leveling
Typical jobHoursAt $150 per hour
Level a 12 x 20 ft shed or carport pad4$600
Level a 2,000 sq ft backyard for turf, pavers or a play area4 to 6$600 to $900
Grade a 1,000 to 1,200 sq ft ADU or garage pad on a flat lot6 to 8$900 to $1,200
Cut and fill a pad into a hillside lot8 to 16$1,200 to $2,400
Regrade a yard that floods toward the house4 to 8$600 to $1,200
Grade and base a gravel parking area for an RV or trailer4 to 6$600 to $900

Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.

Land Clearing & Fire Clearance

Typical hours for Land Clearing, Brush Removal & Fire Clearance
Typical jobHoursAt $150 per hour
Cut 100 feet of defensible space around a home on a sloped lot4 to 8$600 to $1,200
Clear a half acre of weeds and light brush4 to 8$600 to $1,200
Clear an acre of heavy chaparral and small trees8 to 16$1,200 to $2,400
Remove a dead avocado grove, trees and stumps, per acre12 to 24$1,800 to $3,600
Open a 300-foot fence line or fire break4$600
Clear and rough-grade a lot for a building pad8 to 16$1,200 to $2,400

Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.

Trenching

Typical hours for Trenching for Water, Electrical, Irrigation & Drainage
Typical jobHoursAt $150 per hour
Trench 100 feet for a water or irrigation mainline4$600
Trench 200 feet of conduit to a shop, well pump or gate4 to 6$600 to $900
Trench a grid of irrigation mainlines for a new grove or landscape6 to 10$900 to $1,500
Trench 150 feet of drain line from downspouts to daylight4 to 6$600 to $900
Trench water, sewer and power to a new ADU6 to 12$900 to $1,800
Backfill and compact after inspection (often same day)2 to 4$600 to $600

Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.

Driveway & Road Grading

Typical hours for Dirt Driveway & Private Road Grading
Typical jobHoursAt $150 per hour
Regrade and crown a 300-foot dirt driveway4$600
Spread and grade two truckloads of road base on a driveway4 to 6$600 to $900
Grade a quarter mile of shared private road with ditches6 to 10$900 to $1,500
Repair a storm washout and rebuild the roadbed4 to 8$600 to $1,200
Build a new 100-foot gravel driveway from bare ground6 to 10$900 to $1,500
Cut water bars and ditches on a steep grove road4 to 6$600 to $900

Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.

Drainage & Erosion Control

Typical hours for Drainage, French Drains & Erosion Control
Typical jobHoursAt $150 per hour
Install 100 feet of French drain along a foundation or slope4 to 6$600 to $900
Cut a 150-foot swale above a house or pad4 to 6$600 to $900
Build a dry creek bed with rip-rap to carry a seasonal wash6 to 10$900 to $1,500
Regrade a yard that drains toward the house4 to 8$600 to $1,200
Repair storm erosion and rebuild a slope in compacted lifts6 to 12$900 to $1,800
Trench downspout lines to daylight4$600

Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.

Concrete & Demolition

Typical hours for Small Demolition & Concrete Removal
Typical jobHoursAt $150 per hour
Break up and load a 400 sq ft patio or walkway4$600
Remove a 600 sq ft concrete driveway slab4 to 8$600 to $1,200
Tear down a wood or metal shed and load the debris4$600
Demolish 50 feet of block wall and remove the footing4 to 6$600 to $900
Remove the stem walls and footings of a demolished structure6 to 10$900 to $1,500
Remove a pool deck and coping ahead of a pool remodel6 to 10$900 to $1,500

Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.

Dirt Moving & Spreading

Typical hours for Dirt Moving, Fill Dirt & Material Spreading
Typical jobHoursAt $150 per hour
Spread 20 tons of DG or base rock delivered to a driveway4$600
Move a 30-yard stockpile across the property and rough-level it4$600
Backfill a foundation or a retaining wall after inspection4$600
Load 5 dump truck loads of spoil for export4 to 6$600 to $900
Cut and fill 100 cubic yards on a sloped lot6 to 10$900 to $1,500
Place and track-roll 10 loads of imported fill for a pad8 to 12$1,200 to $1,800

Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.

How to keep the hours down

Six things that make the difference between a four-hour job and a six-hour one.

Measure the gate

The T300 needs about 7 feet. If it does not fit, say so and we bring the excavator or plan to pull a fence panel, instead of finding out at the trailer.

Call 811 early

DigAlert is free and takes two working days. A trench job that waits on a locate is a wasted trip, and we will not dig near unmarked lines.

Have material on site

If we are spreading base or fill, have it dropped the day before. The machine spreading is cheaper than the machine waiting for a truck.

Stake or paint the plan

Mark the pad corners, the trench line or the edge of the clearing. Five minutes with marking paint saves a billed half hour of pointing.

Clear the route

Move cars, hoses, pots and the trampoline off the path from the street to the work area before we arrive.

Bundle small jobs

A shed pad and a drainage swale on the same morning cost one minimum, not two. Tell us everything you want done.

Pricing questions

How much do you charge?

$150 per hour with a 4-hour minimum, so the smallest job is $600. That covers the machine, the operator, fuel and delivery inside our core area of Fallbrook, Bonsall, Rainbow, De Luz, Pala and Valley Center. After the first four hours you pay only for the hours used. Material, dump fees and travel outside the core area are quoted separately and approved before we start.

Why is there a 4-hour minimum?

Loading, towing, unloading and reloading the machine takes the better part of two hours whether the job is 30 minutes or all day. The minimum keeps the hourly rate honest for everyone. Most jobs people call about, a driveway regrade, a trench, a shed pad, a patio removal, fit inside four hours anyway.

How do I get a quote?

Text three or four photos of the area with something for scale and tell us what you want the ground to look like when we leave. For most jobs we reply the same day with a range of hours. For bigger grading, clearing or road work we come out and walk it with you first, at no charge, and give you one number.

How soon can you come?

Usually within the week in Fallbrook, Bonsall and Valley Center, and within two weeks in Temecula and the coast. Washouts, fire inspection deadlines and contractors waiting on a trench get moved up. Spring is the busiest season because of fire clearance; book in March if you can.

What forms of payment do you take?

Cash, check, Zelle and Venmo on the day the work is done. For multi-day jobs we invoice at the end of each day. We do not ask for a deposit on jobs under a day.

Get hours and a price for your job

Tell us the job and where it is. We reply with a range of hours the same day, and the first four hours are the only commitment.

  • $150 per hour, 4-hour minimum ($600)
  • Operator, fuel and delivery included in the core area
  • Insured. Owner-operated. Monday to Saturday, 7:00 AM to 6:00 PM
Call Text