Quick answer
Skid Steer Services in Rainbow, CA costs $150 per hour with a 4-hour minimum ($600), operator and fuel included, with no travel charge anywhere in 92028. Typical jobs: spread two truckloads of gravel or road base on a driveway, about 4 hours ($600); backfill a foundation or utility trench after inspection, about 4 hours ($600).
At a glance
- Rate
- $150 per hour, machine and operator
- Minimum
- 4-hour minimum ($600)
- Travel
- No travel charge
- Zip codes
- 92028
What skid steer services looks like in Rainbow
Skid steer work in Rainbow usually involves growers and hillside homes: leveling and graveling container yards and greenhouse pads for the nurseries on the valley floor, spreading base on the private drives off Rainbow Heights Road and Rainbow Crest Road, and cleaning up ground after a grove comes out. The T300's tracks earn their keep on both kinds of Rainbow ground, holding on the steep, rocky foothills and floating on valley soil that the high water table keeps soft after a storm. With the brush cutter on, the same machine mows the 100-foot fire zone North County Fire inspects every spring.
A typical skid steer services job in Rainbow
Raising a soggy corner of a nursery container yard with 40 yards of fill: about $1,500 to $2,900
A typical example: one corner of a container yard off Rainbow Valley Boulevard stays wet for weeks after every storm, because the high water table under the valley floor gives the rain nowhere to go. Raising about 1,800 square feet by 6 inches takes roughly 33 yards compacted, so we order about 40 yards of clean fill at $15 to $35 a yard delivered, $600 to $1,400. The T300 spreads it in lifts, track-rolls it and crowns it to shed water. That is 6 to 10 hours, $900 to $1,500, so about $1,500 to $2,900 before the gravel goes back on. There is no travel charge.
A worked example on normal ground. Your hours depend on the ground, the access and the material.
Typical hours and cost in Rainbow
Everything is $150 per hour with a 4-hour minimum, with no travel charge. These are the common versions of the job on normal ground.
| Typical job | Hours | At $150 per hour |
|---|---|---|
| Spread two truckloads of gravel or road base on a driveway | 4 | $600 |
| Backfill a foundation or utility trench after inspection | 4 | $600 |
| Rough-grade a 2,000 sq ft pad for a shed, barn or ADU | 4 to 8 | $600 to $1,200 |
| Clean up a construction site and load debris | 4 to 6 | $600 to $900 |
| Move and place 40 to 60 tons of DG or fill dirt | 6 to 10 | $900 to $1,500 |
| Clear a quarter acre of light brush with the brush cutter | 4 to 6 | $600 to $900 |
Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.
What is included
- ✓Bobcat T300 compact track loader delivered to your property on our trailer
- ✓An experienced operator for every billed hour, fuel included
- ✓General-purpose bucket for dirt, gravel, DG and debris; tooth bucket for hard ground
- ✓Brush cutter, auger, breaker and pallet-fork attachments when the job calls for them
- ✓Spreading and rough leveling of material you have delivered, or material we arrange
- ✓Site walk before we start and a clean, raked finish before we load up
The ground in Rainbow
Rainbow has two kinds of ground. The valley basin around the village, roughly 640 acres, is deeper soil the County plan rates fair to good, sitting over a high groundwater table that has limited building there since 1966. The outlying foothills are well-drained sandy loam over rock, with outcroppings and the granite boulders that get thicker the farther north you go from Fallbrook, on peaks that reach about 1,800 feet. A trench on the valley floor can find water in a wet year; a trench on the hill finds boulders. The excavator's thumb lifts most of them and the breaker handles the rest.
Permits in Rainbow
Rainbow is unincorporated San Diego County, so grading and demolition permits come from County Planning and Development Services, and projects that need discretionary County review also go to the Rainbow Community Planning Group for a recommendation. Nursery pads, yard leveling, driveway regrading, trenching, drainage on your own lot and small removals usually need no permit. A grading permit generally applies above 200 cubic yards of cut or fill, to a cut or fill over 8 feet high, or to work that alters a watercourse or places fill in a mapped floodway, which matters along Rainbow Creek. Agricultural grading has its own County permit, and a permitted structure with utilities needs a demolition permit.