Freshly graded hilltop pad in Fallbrook with the Bobcat T300 and avocado groves behind

Fallbrook, CA • 92028, 92088 • No travel charge

Concrete & Demolition in Fallbrook, CA

Slabs, patios, walkways, sheds, block walls and old foundations.

$150 per hour • 4-hour minimum • Operator and fuel included • Insured

Quick answer

Concrete & Demolition in Fallbrook, CA costs $150 per hour with a 4-hour minimum ($600), operator and fuel included, with no travel charge anywhere in 92028 or 92088. Typical jobs: break up and load a 400 sq ft patio or walkway, about 4 hours ($600); remove a 600 sq ft concrete driveway slab, about 4 to 8 hours ($600 to $1,200).

At a glance

Rate
$150 per hour, machine and operator
Minimum
4-hour minimum ($600)
Travel
No travel charge
Zip codes
92028, 92088

What concrete & demolition looks like in Fallbrook

Concrete removal and demolition in Fallbrook usually involves slabs poured in the 1970s and 1980s that are cracking and heaving on decomposed granite that was never compacted. Backyard patios come out ahead of pavers, cracked driveways ahead of a new pour, pool decks ahead of a remodel, and sheds, block walls and grove shacks come down where an ADU is going. A typical village job off Main Avenue is a cracked patio broken out before a landscaper sets pavers. Broken concrete is sorted from wood and metal and goes to a North County recycler. A permitted structure or one with utilities can need a demolition permit from County Planning and Development Services.

A typical concrete & demolition job in Fallbrook

A 50-foot block wall and footing on a village lot near Main Avenue: about $1,250 to $1,800

A typical example: a leaning 5-foot block wall, 50 feet long, at the back of a village lot near Main Avenue has to go to make room for an ADU. The breaker cracks the wall and its footing, the loader sorts block and concrete from the rebar, and it all goes into a dump trailer for a North County recycler. Broken block bulks up, so plan on two 10-yard loads. Call it 5 to 6 hours: 5 x $150 = $750 to 6 x $150 = $900. Haul-off adds $500 to $900. Total about $1,250 to $1,800. There is no travel charge in Fallbrook.

A worked example on normal ground. Your hours depend on the ground, the access and the material.

Typical hours and cost in Fallbrook

Everything is $150 per hour with a 4-hour minimum, with no travel charge. These are the common versions of the job on normal ground.

Typical hours for concrete & demolition in Fallbrook
Typical jobHoursAt $150 per hour
Break up and load a 400 sq ft patio or walkway4$600
Remove a 600 sq ft concrete driveway slab4 to 8$600 to $1,200
Tear down a wood or metal shed and load the debris4$600
Demolish 50 feet of block wall and remove the footing4 to 6$600 to $900
Remove the stem walls and footings of a demolished structure6 to 10$900 to $1,500
Remove a pool deck and coping ahead of a pool remodel6 to 10$900 to $1,500

Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.

What is included

  • ✓Hydraulic breaker on the Bobcat or excavator to crack slabs, footings and walls
  • ✓Loading broken concrete and debris into a dump trailer or roll-off
  • ✓Teardown of sheds, carports, fences, block walls and small outbuildings
  • ✓Removal of footings, stem walls and old foundations below grade
  • ✓Rough grading of the cleared area so it is ready for the next trade
  • ✓Haul-off and disposal arranged and quoted up front; concrete goes to a recycler

The ground in Fallbrook

Fallbrook soil is decomposed granite, DG, over fractured granite bedrock, with pockets of clay in the valley bottoms and boulders anywhere north of town. DG grades beautifully when damp, packs hard enough to hold a vertical cut, and turns to dust in August and to soup in a February storm. It drains well until it is compacted, which most yards are, so drainage problems are common and grading usually fixes them.

Permits in Fallbrook

Fallbrook is unincorporated, so permits come from County of San Diego Planning and Development Services, not a city hall. Most of what we do needs none: yard and shed pads, driveway regrading, drainage on your own lot, trenching, patio and shed removal. A grading permit generally applies above 200 cubic yards of cut and fill, or with deep cuts, or near a watercourse, and a demolition permit applies to permitted structures with utilities. We tell you when a job looks like it crosses one of those lines.

Concrete & Demolition in Fallbrook: questions people ask

How much does concrete & demolition cost in Fallbrook?

$150 per hour with a 4-hour minimum, so the smallest job is $600, operator and fuel included, with no travel charge anywhere in 92028 or 92088. Other typical jobs: tear down a wood or metal shed and load the debris, about 4 hours ($600); demolish 50 feet of block wall and remove the footing, about 4 to 6 hours ($600 to $900). Material, haul-off and dump fees are quoted separately before the job.

Can the broken concrete stay on my property instead of being hauled?

Some of it can. Clean broken slab, with the rebar and mesh cut out, makes a stacked garden wall, stepping pieces or armor at a ditch outfall on a Fallbrook hillside, and every piece that stays saves haul-off. What we do not do is bury it as fill under a pad, a driveway or a slope, because the voids between chunks settle for years. Tell us what you want to keep before we load the trailer.

Is there a travel charge to Fallbrook?

Fallbrook is home base. No travel charge anywhere in 92028. The rate is the same $150 per hour with a 4-hour minimum everywhere we work, and the hourly clock runs only while the machine is working on your property.

How soon can you start concrete & demolition in Fallbrook?

Usually within the week. Fallbrook is in our core area, close to our Fallbrook yard. Washouts, fire inspection deadlines and contractors waiting on a trench get moved up. Text photos of the job and we reply the same day with a range of hours and the first open morning.

Can you remove a slab next to my house without damaging it?

Yes. We saw-cut or break a relief line along the foundation first so the breaker does not transmit shock into the house, then work away from the wall. The last foot against the stem wall is done carefully with the breaker on low energy or by hand. We have done this on dozens of patios and pool decks poured up against the house.

Do you tear down houses or garages?

Not occupied houses, and not any structure with live gas, water or power, or with asbestos or lead paint. Sheds, carports, grove shacks, barns that have been disconnected and small detached structures, yes. For a full house or garage demolition a licensed demolition contractor handles the permit and the hazmat and we are often brought in afterward for the slab, the footings and the grading.

Get a free estimate for concrete & demolition in Fallbrook

Tell us the job and where it is. We reply with a range of hours the same day, and the first four hours are the only commitment.

  • $150 per hour, 4-hour minimum ($600)
  • Operator, fuel and delivery included in the core area
  • Insured. Owner-operated. Monday to Saturday, 7:00 AM to 6:00 PM
Call Text