Bobcat T300 and mini excavator cutting a pad into a Fallbrook hillside

Fallbrook, CA • 92028, 92088 • No travel charge

Grading & Leveling in Fallbrook, CA

Pads for sheds, barns and ADUs, yard leveling, cut and fill on hillside lots.

$150 per hour • 4-hour minimum • Operator and fuel included • Insured

Quick answer

Grading & Leveling in Fallbrook, CA costs $150 per hour with a 4-hour minimum ($600), operator and fuel included, with no travel charge anywhere in 92028 or 92088. Typical jobs: level a 12 x 20 ft shed or carport pad, about 4 hours ($600); level a 2,000 sq ft backyard for turf, pavers or a play area, about 4 to 6 hours ($600 to $900).

At a glance

Rate
$150 per hour, machine and operator
Minimum
4-hour minimum ($600)
Travel
No travel charge
Zip codes
92028, 92088

What grading & leveling looks like in Fallbrook

Grading and leveling in Fallbrook usually involves cut and fill on a hillside: cutting a pad for a shed, barn, workshop or ADU into an old grove slope off Reche Road, Via Monserate, Olive Hill Road or Rainbow Valley Boulevard, then pushing the cut downhill and track-rolling it in lifts. Decomposed granite holds a vertical cut and packs hard when damp, so the cut usually supplies the fill. Fallbrook is unincorporated, so County Planning and Development Services is the authority, and a grading permit generally applies above 200 cubic yards, to a cut or fill over 8 feet high, or to work in a watercourse. A shed pad or yard leveling stays well under that.

A typical grading & leveling job in Fallbrook

A 30 x 40 ft workshop pad cut into a grove slope off Gird Road: about $1,500 to $1,800

A typical example: a 30 by 40 foot workshop pad on a grove slope off Gird Road, where the ground falls about 8 feet across it. We cut roughly 4 feet into the uphill side, push the decomposed granite down to build the low side and track-roll it in lifts, so the cut supplies all the fill. A 4-foot cut and a 4-foot fill sit well below the County's 8-foot permit line, and the volume stays far under 200 cubic yards. Call it 10 to 12 hours: 10 x $150 = $1,500 to 12 x $150 = $1,800. Nothing is imported, and there is no travel charge in Fallbrook.

A worked example on normal ground. Your hours depend on the ground, the access and the material.

Typical hours and cost in Fallbrook

Everything is $150 per hour with a 4-hour minimum, with no travel charge. These are the common versions of the job on normal ground.

Typical hours for grading & leveling in Fallbrook
Typical jobHoursAt $150 per hour
Level a 12 x 20 ft shed or carport pad4$600
Level a 2,000 sq ft backyard for turf, pavers or a play area4 to 6$600 to $900
Grade a 1,000 to 1,200 sq ft ADU or garage pad on a flat lot6 to 8$900 to $1,200
Cut and fill a pad into a hillside lot8 to 16$1,200 to $2,400
Regrade a yard that floods toward the house4 to 8$600 to $1,200
Grade and base a gravel parking area for an RV or trailer4 to 6$600 to $900

Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.

What is included

  • ✓Site walk and grade check with you before the machine unloads
  • ✓Cut and fill with the Bobcat T300; excavator for tight corners and hard cuts
  • ✓Fill placed in lifts and track-rolled; vibratory compaction arranged when a plan calls for it
  • ✓Drainage built into the grade so water leaves the pad, not into it
  • ✓Spreading base rock, DG or gravel you order or we arrange
  • ✓Rough or finish grade to match the next trade: shed, foundation, pavers, turf or gravel

The ground in Fallbrook

Fallbrook soil is decomposed granite, DG, over fractured granite bedrock, with pockets of clay in the valley bottoms and boulders anywhere north of town. DG grades beautifully when damp, packs hard enough to hold a vertical cut, and turns to dust in August and to soup in a February storm. It drains well until it is compacted, which most yards are, so drainage problems are common and grading usually fixes them.

Permits in Fallbrook

Fallbrook is unincorporated, so permits come from County of San Diego Planning and Development Services, not a city hall. Most of what we do needs none: yard and shed pads, driveway regrading, drainage on your own lot, trenching, patio and shed removal. A grading permit generally applies above 200 cubic yards of cut and fill, or with deep cuts, or near a watercourse, and a demolition permit applies to permitted structures with utilities. We tell you when a job looks like it crosses one of those lines.

Grading & Leveling in Fallbrook: questions people ask

How much does grading & leveling cost in Fallbrook?

$150 per hour with a 4-hour minimum, so the smallest job is $600, operator and fuel included, with no travel charge anywhere in 92028 or 92088. Other typical jobs: grade a 1,000 to 1,200 sq ft ADU or garage pad on a flat lot, about 6 to 8 hours ($900 to $1,200); cut and fill a pad into a hillside lot, about 8 to 16 hours ($1,200 to $2,400). Material, haul-off and dump fees are quoted separately before the job.

What time of year is right for grading in Fallbrook?

Late winter and spring, a few days after a rain, when the decomposed granite is damp. Damp DG cuts cleanly and packs tight in lifts. In August it is dust, and fill placed dry does not compact, so summer pads need water added as we go. In the middle of a storm we stop, because wet DG ruts and smears. We grade year round, but a pad graded in March or April usually goes fastest.

Is there a travel charge to Fallbrook?

Fallbrook is home base. No travel charge anywhere in 92028. The rate is the same $150 per hour with a 4-hour minimum everywhere we work, and the hourly clock runs only while the machine is working on your property.

How soon can you start grading & leveling in Fallbrook?

Usually within the week. Fallbrook is in our core area, close to our Fallbrook yard. Washouts, fire inspection deadlines and contractors waiting on a trench get moved up. Text photos of the job and we reply the same day with a range of hours and the first open morning.

Do I need a grading permit?

Usually not for a shed pad, a yard leveling or a driveway. The County of San Diego grading ordinance generally kicks in above 200 cubic yards, or with deeper cuts and fills, or in sensitive or drainage areas. For an ADU or a building pad your contractor or designer should confirm, and we grade to the plan they provide.

Can you grade an ADU pad to my plans?

Yes. Send the site plan with the pad elevation and we set grade stakes and cut to it. We rough-grade to within a few inches so the foundation contractor can fine-grade and form. If the plan calls for engineered compaction we coordinate the compaction testing with your soils engineer.

Get a free estimate for grading & leveling in Fallbrook

Tell us the job and where it is. We reply with a range of hours the same day, and the first four hours are the only commitment.

  • $150 per hour, 4-hour minimum ($600)
  • Operator, fuel and delivery included in the core area
  • Insured. Owner-operated. Monday to Saturday, 7:00 AM to 6:00 PM
Call Text