Quick answer
Grading & Leveling in Fallbrook, CA costs $150 per hour with a 4-hour minimum ($600), operator and fuel included, with no travel charge anywhere in 92028 or 92088. Typical jobs: level a 12 x 20 ft shed or carport pad, about 4 hours ($600); level a 2,000 sq ft backyard for turf, pavers or a play area, about 4 to 6 hours ($600 to $900).
At a glance
- Rate
- $150 per hour, machine and operator
- Minimum
- 4-hour minimum ($600)
- Travel
- No travel charge
- Zip codes
- 92028, 92088
What grading & leveling looks like in Fallbrook
Grading and leveling in Fallbrook usually involves cut and fill on a hillside: cutting a pad for a shed, barn, workshop or ADU into an old grove slope off Reche Road, Via Monserate, Olive Hill Road or Rainbow Valley Boulevard, then pushing the cut downhill and track-rolling it in lifts. Decomposed granite holds a vertical cut and packs hard when damp, so the cut usually supplies the fill. Fallbrook is unincorporated, so County Planning and Development Services is the authority, and a grading permit generally applies above 200 cubic yards, to a cut or fill over 8 feet high, or to work in a watercourse. A shed pad or yard leveling stays well under that.
A typical grading & leveling job in Fallbrook
A 30 x 40 ft workshop pad cut into a grove slope off Gird Road: about $1,500 to $1,800
A typical example: a 30 by 40 foot workshop pad on a grove slope off Gird Road, where the ground falls about 8 feet across it. We cut roughly 4 feet into the uphill side, push the decomposed granite down to build the low side and track-roll it in lifts, so the cut supplies all the fill. A 4-foot cut and a 4-foot fill sit well below the County's 8-foot permit line, and the volume stays far under 200 cubic yards. Call it 10 to 12 hours: 10 x $150 = $1,500 to 12 x $150 = $1,800. Nothing is imported, and there is no travel charge in Fallbrook.
A worked example on normal ground. Your hours depend on the ground, the access and the material.
Typical hours and cost in Fallbrook
Everything is $150 per hour with a 4-hour minimum, with no travel charge. These are the common versions of the job on normal ground.
| Typical job | Hours | At $150 per hour |
|---|---|---|
| Level a 12 x 20 ft shed or carport pad | 4 | $600 |
| Level a 2,000 sq ft backyard for turf, pavers or a play area | 4 to 6 | $600 to $900 |
| Grade a 1,000 to 1,200 sq ft ADU or garage pad on a flat lot | 6 to 8 | $900 to $1,200 |
| Cut and fill a pad into a hillside lot | 8 to 16 | $1,200 to $2,400 |
| Regrade a yard that floods toward the house | 4 to 8 | $600 to $1,200 |
| Grade and base a gravel parking area for an RV or trailer | 4 to 6 | $600 to $900 |
Hours are typical ranges for normal ground and access. Rock, roots, steep slopes and tight gates add time. Material, haul-off and dump fees are quoted separately. 4-hour minimum applies.
What is included
- ✓Site walk and grade check with you before the machine unloads
- ✓Cut and fill with the Bobcat T300; excavator for tight corners and hard cuts
- ✓Fill placed in lifts and track-rolled; vibratory compaction arranged when a plan calls for it
- ✓Drainage built into the grade so water leaves the pad, not into it
- ✓Spreading base rock, DG or gravel you order or we arrange
- ✓Rough or finish grade to match the next trade: shed, foundation, pavers, turf or gravel
The ground in Fallbrook
Fallbrook soil is decomposed granite, DG, over fractured granite bedrock, with pockets of clay in the valley bottoms and boulders anywhere north of town. DG grades beautifully when damp, packs hard enough to hold a vertical cut, and turns to dust in August and to soup in a February storm. It drains well until it is compacted, which most yards are, so drainage problems are common and grading usually fixes them.
Permits in Fallbrook
Fallbrook is unincorporated, so permits come from County of San Diego Planning and Development Services, not a city hall. Most of what we do needs none: yard and shed pads, driveway regrading, drainage on your own lot, trenching, patio and shed removal. A grading permit generally applies above 200 cubic yards of cut and fill, or with deep cuts, or near a watercourse, and a demolition permit applies to permitted structures with utilities. We tell you when a job looks like it crosses one of those lines.