SoCal Dirt Movers, Fallbrook, CA • Updated
Quick answer
Concrete removal with a Bobcat and hydraulic breaker in Fallbrook and North San Diego County costs about $850 to $1,050 for a 400 sq ft patio: 4 hours of labor at $150 per hour plus one 10-yard haul-off load at $250 to $450. A 600 sq ft driveway slab runs about $850 to $1,650, and an 800 sq ft pool deck about $1,400 to $2,400.
At a glance
- Rate
- $150 per hour, 4-hour minimum ($600)
- 400 sq ft patio
- About $850 to $1,050 with haul-off
- Haul-off
- $250 to $450 per 10-yard load, recycler fee included
- Cubic yards
- Sq ft x thickness in feet, divided by 27
- 4-inch slab
- About 1.2 cubic yards per 100 sq ft
- Out of scope
- Occupied houses, live utilities, asbestos or lead paint
How much does concrete removal cost by slab size?
Concrete removal starts around $850 for a patio or walkway and runs $1,400 to $2,400 for a pool deck or old footings, counting both machine time and haul-off. Labor is $150 per hour with a 4-hour minimum, with the operator, fuel and hydraulic breaker included. Haul-off is a 10-yard dump trailer or roll-off load at roughly $250 to $450 each, recycler fee included, quoted before the first slab is broken.
| Slab | Concrete | Hours | Labor | Loads | Total |
|---|---|---|---|---|---|
| Walkway, 3 x 40 ft, 4 in thick | 1.5 cu yd | 4 | $600 | 1 (partial) | $850 to $1,050 |
| Patio, 400 sq ft, 4 in | 4.9 cu yd | 4 | $600 | 1 | $850 to $1,050 |
| Driveway slab, 600 sq ft, 4 in | 7.4 cu yd | 4 to 8 | $600 to $1,200 | 1 | $850 to $1,650 |
| Pool deck and coping, 800 sq ft, 4 in | 9.9 cu yd | 6 to 10 | $900 to $1,500 | 2 | $1,400 to $2,400 |
| Footings, 160 ft of 12 x 18 in | 8.9 cu yd | 6 to 10 | $900 to $1,500 | 2 | $1,400 to $2,400 |
A walkway alone costs about the same as a patio because of the 4-hour minimum. Bundle it with the patio, a shed teardown or yard leveling and the extra work rides on the same minimum. Every typical job is on the concrete and demolition service page.
How many cubic yards of concrete is in my slab?
Multiply the area in square feet by the thickness in feet, then divide by 27 to get cubic yards. Thickness in feet is the inches divided by 12, so a 4-inch slab is a third of a foot and a 6-inch slab is half a foot.
- 400 sq ft at 4 inches: 400 x 4 divided by 12 is 133 cubic feet; divided by 27, about 4.9 cubic yards
- 600 sq ft at 4 inches: 600 x 4 divided by 12 is 200 cubic feet; divided by 27, about 7.4 cubic yards
- 600 sq ft at 6 inches: 600 x 6 divided by 12 is 300 cubic feet; divided by 27, about 11.1 cubic yards
- Rule of thumb: every 100 sq ft of 4-inch slab is about 1.2 cubic yards; at 6 inches, about 1.9
Measure the thickness at an edge or a crack before you ask for a quote. Driveways and pool decks are often thicker than they look, and old slabs poured over a low spot can be 6 inches or more in places.
Why does broken concrete need more trailer space than the slab?
Broken concrete takes up more room than the slab it came from, because the pieces never fit back together and the gaps between them are air. A slab that measures 5 cubic yards in the ground fills well over 5 yards of trailer. As a planning number, one 10-yard load holds the broken pieces of a 4-inch slab up to about 600 sq ft, roughly 7 cubic yards in the ground.
Weight is the other limit. Concrete is heavy, and haulers cap loads by weight as well as volume, so thick slabs and footings can fill a load before it looks full. We confirm the load count with the hauler when we quote. The machines do not haul material off site themselves; the dump trailer or roll-off is arranged through local haulers and billed at cost.
What do typical concrete removal jobs cost?
Three typical examples, worked out the way the quote is written.
- 1
Backyard patio ahead of pavers: about $850 to $1,050
A 400 sq ft, 4-inch patio with no rebar. That is 400 x 4 divided by 12, or 133 cubic feet, about 4.9 cubic yards: one 10-yard load. Breaking and loading take 4 hours, $600. Haul-off is $250 to $450. Total: about $850 to $1,050.
- 2
Cracked driveway slab with rebar: about $1,150 to $1,650
A 600 sq ft, 4-inch driveway slab with rebar, about 7.4 cubic yards, which fills one load. Rebar slows the breaking and the steel has to be pulled out and separated, so plan on 6 to 8 hours, $900 to $1,200. Add $250 to $450 for the load. Total: about $1,150 to $1,650.
- 3
Pool deck in Temecula ahead of a remodel: about $1,400 to $2,400 plus travel
An 800 sq ft, 4-inch deck plus coping, about 9.9 cubic yards, so two loads at $250 to $450 each, or $500 to $900. Breaking near the pool and loading take 6 to 10 hours, $900 to $1,500. Total: about $1,400 to $2,400, plus the flat Temecula travel charge quoted before booking.
What makes a slab take longer to remove?
Rebar, thickness, a slab poured against the house and tight access are what push a job to the top of its range.
- Rebar and wire mesh. The breaker cracks the concrete, but the steel holds the pieces together, so each section has to be pulled apart and the steel separated. Mesh is quicker than heavy rebar.
- Thickness. A 6-inch slab has 50 percent more concrete than a 4-inch one, and the breaker spends longer on every square foot.
- Slabs against the house. We saw-cut or break a relief line along the foundation first so the breaker does not send shock into the house, then work away from the wall and take the last strip carefully, on low energy or by hand.
- Access. The T300 needs a gate of about 7 feet. In a narrow side yard the mini excavator runs the breaker instead, and loading takes longer.
- Lines under the slab. Gas to a barbecue, power to yard lights and irrigation often run under patios, and 811 does not mark private lines. Read how 811 works before any digging below the slab.
Where does the removed concrete go?
Clean concrete goes to a recycler in North County, where it is crushed into road base, the same material that goes back onto local driveways. Recycling costs less than the landfill, so we keep concrete loads free of wood, trash and dirt, and rebar and wire mesh are separated and recycled as scrap.
If you want some flat pieces for a garden wall or stepping stones, say so and we stack them, which can also trim the haul-off. If a new driveway is next, our road base vs DG vs gravel guide covers what goes down after.
Do I need a permit, and what is out of scope?
Removing a slab, a walkway or an unpermitted shed under 120 sq ft in unincorporated San Diego County generally does not need a permit. Larger structures, anything with a permit on record and anything with utilities can need a demolition permit from County Planning and Development Services, and the contractor on the bigger project usually pulls it. In Temecula, check with the City; most tract homes also need HOA approval before the yard changes.
Some concrete jobs are not ours. We do not demolish occupied houses or any structure with live gas, water or power. We do not handle asbestos, lead paint or other hazardous material; an abatement contractor handles that first. We do not pull permits for you. When a house or garage comes down, a demolition contractor handles the structure and we often come in afterward for the slab, the footings and the grading.
Is a machine worth it for a small slab?
For a few sidewalk squares or a small landing, often not. A rented electric breaker and a weekend can cost less than the $600 minimum, as long as you have a way to get the pieces to a recycler. The machine pays off at about patio size, or when the small slab is bundled with other work on the same morning: a walkway, a yard leveling and a sprinkler trench in one visit share one minimum. See the pricing page for typical hours on every job.
Questions people ask
How many dump trailer loads is my concrete slab?
Work out the cubic yards, square feet times thickness in feet divided by 27, and plan on one 10-yard load for about every 7 cubic yards of 4-inch slab, because broken pieces take more room than the slab did. A 400 to 600 sq ft patio or driveway is usually one load; an 800 sq ft pool deck is two. Thick slabs can hit the hauler's weight limit first.
How long does it take to break up a concrete patio?
A 400 sq ft, 4-inch patio takes about 4 hours with the hydraulic breaker, including loading it into the trailer. A 600 sq ft driveway slab takes 4 to 8 hours, and a pool deck 6 to 10. Rebar, extra thickness and a slab poured against the house push the time toward the top of each range.
Is it cheaper to break concrete with a rented jackhammer?
For a very small slab, sometimes. A few sidewalk squares can be a weekend with a rented electric breaker, and you skip the 4-hour minimum. For a full patio or a driveway, a hand breaker takes days, and you still need a trailer and a trip to the recycler. The Bobcat breaker does a 400 sq ft patio, loaded, in about 4 hours.
Can you leave the ground ready for pavers or a new slab?
Yes. After the concrete is out, the same machine rough-grades the area to the base depth your installer asks for, and we spread base rock if you order it. Grading time is billed at the same $150 per hour in half hours after the minimum, and any base material is quoted separately before the job.
Will the Bobcat crack my driveway getting to the patio?
Rubber tracks spread the T300's weight, so it is much easier on a driveway than a loaded truck. We plan the route in before we unload, lay plywood over pavers or lawn we have to cross, and park the trailer on the street when the driveway looks thin or already cracked. Tell us about anything fragile on the way in.
Do you remove concrete that has rebar in it?
Yes. The breaker cracks reinforced slabs, and the loader and excavator pull the pieces apart so the rebar or wire mesh can be separated and recycled as scrap. Reinforced concrete takes longer than plain slab, so a rebar driveway usually lands at the top of its hour range. Tell us if you know the slab has steel in it.
Sources
Rules change. Check with the agency before you rely on a deadline or a threshold.
How these numbers are worked out. Labor is our published rate, $150 per hour with a 4-hour minimum, times the hours these jobs typically take on normal ground. Material prices are typical delivered prices from North County yards and change with the yard and the distance. For a number on your job, text photos to (442) 271-2748 or send the estimate form.
